Portable Pump at Tara Park
Installation of a portable pump system at the Tara Park Pond to assist with stormwater drainage during periods of heavy rainfall. The system will allow controlled discharge to the North New River Canal under emergency authorization, improving flood response capacity for the surrounding area.



